Under the Rajasthan Renewable Energy Policy, 2023, which body is the nodal agency for registration and approval of renewable energy projects?
Explanation
RREC registers and approves projects, develops solar parks and ultra mega renewable energy power parks, recommends allotment of government land, and helps secure power evacuation approval.
What total renewable power capacity does the Rajasthan Renewable Energy Policy, 2023 target by 2029-30?
Explanation
The goal is split three ways — 65,000 MW of solar, 15,000 MW of wind and hybrid, and 10,000 MW of hydro, pumped storage plants and battery energy storage systems.
Under the Rajasthan Renewable Energy Policy, 2023, what is the maximum capacity of a decentralised solar power project set up near a 33 kV grid sub-station?
Explanation
The minimum capacity for such projects is 0.5 MW. Sited close to load centres they cut transmission and distribution losses, and farmers may set them up on their own uncultivable land.
On which date was the Rajasthan Renewable Energy Policy, 2023 notified?
Explanation
Issued as notification F.20(13)Energy/2023 by the Energy Department, it replaced the Solar and the Wind and Hybrid Energy Policies of 2019 and stays in force until superseded.
According to the National Institute of Wind Energy, what is Rajasthan's wind power potential at 150 metre height?
Explanation
The assessment is recorded in the Rajasthan Renewable Energy Policy, 2023. The same policy promotes repowering of wind turbines that have completed at least ten years in operation.
What solar potential has the National Institute of Solar Energy assessed for the state of Rajasthan?
Explanation
The figure rests on the state's intense solar radiation, its high count of sunny days through the year, and the large stretches of barren, uncultivable government and private land available.
Which special purpose vehicle has been set up as a subsidiary of RREC to develop and manage solar and renewable energy parks in Rajasthan?
Explanation
Under the policy RREC develops renewable energy parks on its own or through such a vehicle. Parks may also be built by private developers or through joint ventures with the state government.
What is the installed capacity of the Bhadla Solar Park in Rajasthan?
Explanation
Bhadla lies within a fully operational solar park spread over about 5,700 hectares. Rajasthan offers large tracts of government land at competitive rates for parks of this kind.
The Pugal and Khuiyala solar cluster of Rajasthan lies in which district?
Explanation
The state's named clusters are the Bhadla solar park, the Jaisalmer wind energy cluster, Barmer solar and wind, the Phalodi-Pokhran solar cluster, and Pugal and Khuiyala in Bikaner.
Where does Rajasthan rank among Indian states in installed solar power capacity?
Explanation
Installed solar capacity in the state stands at 22,860.73 MW. Vast barren stretches of the Thar Desert and strong solar radiation make it India's best-suited state for utility-scale solar.
What is Rajasthan's rank in India in installed wind power capacity?
Explanation
Installed wind capacity in the state is 5,195.82 MW. Jaisalmer, Barmer and Jodhpur see consistent strong wind currents, which is why most wind projects sit in western Rajasthan.
Rajasthan ranks second among Indian states in installed renewable energy capacity. What is that total capacity?
Explanation
In 2023 Rajasthan held the country's highest grid-connected renewable capacity at 22,398 MW, with Gujarat next at 19,436 MW, the lead resting mainly on solar and wind.
Renewable energy accounts for roughly what share of Rajasthan's total installed power capacity?
Explanation
The remaining roughly 78.79 per cent comes from conventional sources. Among the major states Rajasthan has recorded the highest annual growth in installed renewable capacity, at 18.63 per cent.
About how many clear sunny days does Rajasthan get in a year?
Explanation
Alongside the long hours of sun, Rajasthan receives solar radiation averaging 6 to 7 kWh per square metre per day, among the best conditions in India for large solar installations.
The grid sub-stations of the green energy corridor being developed in western Rajasthan are expected to handle how much green energy?
Explanation
The corridor is a network of grid sub-stations built to integrate solar and wind generation, most of which is concentrated in western Rajasthan where land and resource conditions are strongest.
Under the Rajasthan Renewable Energy Policy, 2023, electricity duty on solar energy was cut from 60 paise per unit to what level?
Explanation
The policy also gives renewable projects full exemption from land tax for seven years, a waiver of banking charges, and relief on transmission, distribution and cross-subsidy surcharges.
Under the Rajasthan Renewable Energy Policy, 2023, one resource in a wind-solar plant must be at least what share of the other for the plant to count as a hybrid?
Explanation
Hybrid projects make better use of land and transmission systems and steady the grid. The policy also encourages hybridising existing wind or solar plants and conventional thermal stations.
Under net metering in the Rajasthan Renewable Energy Policy, 2023, DISCOMs will allow rooftop solar capacity addition up to what share of the area's distribution transformer capacity?
Explanation
The policy aims to develop district headquarters as Green Energy Cities through rooftop systems. Under gross metering, where all output goes to the DISCOM, rooftop plants up to 1 MW are allowed.
Under the Rajasthan Renewable Energy Policy, 2023, what is the minimum rated energy capacity of the storage system installed with a 50 MW project?
Explanation
The policy sets storage at X/2 MWh, where X is the project's installed capacity in MW. For a standalone battery system, at least 85 per cent of the energy stored over a year must come from renewable sources.
Instead of paying the Renewable Energy Development and Facilitation Charge, a developer may choose to supply what share of generated power free to the Rajasthan DISCOMs?
Explanation
The charge runs at Rs 50,000 per hectare per year and applies to projects selling power to parties other than the Rajasthan DISCOMs. Projects supplying the state DISCOMs are exempt from it.